Specifications
98AEtypSMSspec_RevC.doc
20
Copyright © 2007, Mitsubishi Electric Power Products, Inc.
SP-0012 Rev. C 09/05/09
1. Visual Inspection
a. Ensure that shipping members have been removed.
b. Ensure that interiors are free of foreign materials, tools and dirt.
c. Check for damage (dents, scratches, frame misalignment, damage to panel devices,
etc)
d. Check doors for proper alignment and operation.
2. Mechanical Inspection
a. Check all the power wiring connections for tightness.
b. Check all the control wiring connections for tightness.
3. Electrical Inspection
a. Check input and bypass for proper voltage and phase rotation.
b. Check battery for proper voltage and polarity.
4. Start-up
a. Energize the UPS.
b. Check the DC output voltage and inverter output voltage.
c. Check the inverter output voltage on battery operation.
d. Check for the proper synchronization.
e. Perform manual transfers and returns.
f. Perform auto transfers.










