Specifications

98AEtypSMSspec_RevC.doc
19
Copyright © 2007, Mitsubishi Electric Power Products, Inc.
SP-0012 Rev. C 09/05/09
2.3.2 Serviceability
The UPS shall have front access for all servicing adjustment and connections only for
maintenance or service. Side access or rear access shall not be accepted. The UPS shall
be designed such that its rear can be pressed against a back wall and its sides can be
pressed against side walls.
2.3.3 Ventilation
Forced air cooling shall be provided to allow all components to operate within their rated
temperature window. Thermal relays, using a latched contact which is capable of being
reset, shall be used as overload protection to all cooling fans. Each fan shall employ a
separate thermal relay. All air inlets use washable air filters that shall be removable from
the front of the UPS without exposure to any electrical hazard. Air filters shall be door
mounted to prevent floor dust from being sucked into the unit. Bottom mount air filters shall
not be accepted.
2.3.4 Busbar
All busbar used for conductivity within the UPS shall be designed with COPPER ONLY.
Aluminum not acceptable
2.3.5 (Option) Eyebolts
Eyebolts shall be installed for lifting UPS. Four (4) heavy duty eyebolts will be installed
on each corner on top of UPS. Eyebolts are detachable (unscrew manually) once UPS is
set in installation area.
PART 3 EXECUTION`
3.1 SITE PREPARATION
The owner shall prepare the site for installation of the equipment.
3.2 INSTALLATION
A. The UPS shall be set in place, wired and connected in accordance with the approved
installation drawings and owners/technical manual delivered with equipment.
B. The equipment shall be installed in accordance with local codes and manufacturer’s
recommendation.
3.3 FIELD QUALITY CONTROL
A. The equipment shall be checked out and started by a customer support representative from
the equipment manufacturer. Visual and mechanical inspection of electrical installation, initial
UPS startup and operational training shall be performed. A signed service report shall be
submitted after equipment is operational.
B. The following inspection and test procedures shall be performed by field service personnel
during the UPS startup;