Specifications
4M41 ENGINE -
Piston and Connecting Rod
11B-23-3
PRE-REMOVAL INSPECTION
1. PISTON PROTRUSION FROM CRANKCASE TOP
Caution
Do not fail to check piston protrusions. The engine
performance are directly influenced by them.
(1) Position each piston at the TDC.
(2) There are five reference points A on the upper
crankcase
*b
that serve as a zero level each. Check
piston protrusions with respect to these reference
points. (Piston protrusion = Measuring point B -
Reference point A)
(3) Measure piston protrusions at two points per cylinder
(8 in total) using the closest reference point, and
average the readings.
(4) If the average deviates from the specified standard
value, check clearances at necessary points.
Standard value: - 0.20 - - 0.30 mm
(5) Select the cylinder head gasket having a thickness
that corresponds with the average of piston
protrusions (measured at 8 points).
2. CONNECTING ROD END PLAY
(1) Measure end play of each connecting rod.
(2) If the measurement exceeds the specified service limit,
replace defective part.
Standard value: 0.15 - 0.45 mm
Limit: 0.6 mm
REMOVAL SERVICE POINTS
A
A
"
NUT REMOVAL
Caution
Provide one punch mark A on the head of the nut 1 each
time it is used to tighten the connecting rod bolt 14. If
it has three punch marks (the evidence of having been
tightened 3 times), replace both the nut 1 and the
connecting rod bolt 14.
A
B
"
PISTON RING REMOVAL
Using the special tool, remove each piston ring.
PWEE9409-D
E
Feb. 2000Mitsubishi Motors Corporation Added
*b
A
5
1
14
MH060014










