User's Manual
1. PREPARATORY PROCEDURES FOR MONITORING
1.6 Checking for Normal Monitoring
1 - 51
1
PREPARATORY 
PROCEDURES FOR 
MONITORING
2
DEVICE RANGE 
THAT CAN BE SET
3
ACCESS RANGE 
FOR MONITORING
4
HOW TO MONITOR 
REDUNTANT 
SYSTEM
5
BUS CONNECTION
6
DIRECT 
CONNECTION TO 
CPU
7
COMPUTER LINK 
CONNECTION
8
ETHERNET 
CONNECTION
 Checking the wiring state (For optical loop system only)
Check if the optical fiber cable is connected correctly in [Loop test] of GX Developer.
For the GX Developer operation method, refer to the following manual.
Q Corresponding MELSECNET/H Network System Reference Manual (PLC to PLC network)
(2) Check the [Receive direction error station] (The display example on GX Developer Version 8)
GX Developer   [Diagnostics]   [MELSECNET (II)/10/H diagnostics]   
Startup procedure
Loop test










