User's Manual
13. CC-Link CONNECTION (INTELLIGENT DEVICE STATION)
13.4 PLC Side Setting
13 - 35
9
MELSECNET/H 
CONNECTION (PLC 
TO PLC NETWORK)
10
MELSECNET/10 
CONNECTION (PLC 
TO PLC NETWORK)
11
CC-Link IE CONTROLLER 
NETWORK 
CONNECTION
12
CC-Link IE FIELD 
NETWORK 
CONNECTION
13
CC-Link CONNECTION 
(INTELLIGENT DEVICE 
STATION)
14
CC-Link 
CONNECTION 
(Via G4)
15
INVERTER 
CONNECTION
16
SERVO AMPLIFIER 
CONNECTION
POINT
POINT
POINT
When changing the sequence program
After writing the sequence program to the PLC CPU, operate the PLC CPU ether turning OFF and then ON or resetting.
Head No. of RX (RX0)
RY head number (RY0)
RX refresh destination (X)
No. of refresh points (32)
RX refresh destination
device head No. (400)
RY refresh destination (Y)
No. of refresh points (32)
RY refresh destination 
device head No. (400)
RW head No. (RW0)
RW refresh destination (D)
RW refresh destination 
device head No. (200)
SB head No. (SB0)
SB refresh destination (B)
No. of refresh points (512)
No. of refresh points (260)
SB refresh destination
device head number (0)
SW head number (SW0)
SW refresh destination (W)
No. of refresh points (512)
Dedicated instruction
(RRPA)
CC-Link module head 
I/O No. (0000
H)
Parameter storage head 
device (D100)
SW refresh destination 
device head No. (0)










