User's Manual
11. CC-Link IE CONTROLLER NETWORK CONNECTION
11.4 PLC Side Setting
11 - 11
9
MELSECNET/H 
CONNECTION (PLC 
TO PLC NETWORK)
10
MELSECNET/10 
CONNECTION (PLC 
TO PLC NETWORK)
11
CC-Link IE CONTROLLER 
NETWORK 
CONNECTION
12
CC-Link IE FIELD 
NETWORK 
CONNECTION
13
CC-Link CONNECTION 
(INTELLIGENT DEVICE 
STATION)
14
CC-Link 
CONNECTION 
(Via G4)
15
INVERTER 
CONNECTION
16
SERVO AMPLIFIER 
CONNECTION
 Parameter settings (Connection to MELSEC-
Q, QS series) of System configuration1 
(Network Type: CC IE Control)
(1) [Network parameter] of GX Developer
(a) Network parameter
: Necessary  : As necessary  : Not necessary
*1 When using Q170MCPU, set it according to the system 
configuration.
*2 Specify the same network No. as that of the GOT.
*3 Set the same mode setting as that of the GOT.
(b) Network range assignment
: Necessary  : As necessary  : Not necessary
*1 Be sure to set it to perform the cyclic transmission.
POINTPOINTPOINT
When changing the network parameter
After writing the network parameter to the PLC CPU,
operate the PLC CPU ether turning OFF and then ON
or resetting.
Item Set value
Setting 
necessity at 
GOT 
connection
Network type
CC IE Control
(Control station) (fixed)
Starting I/O No.
*1
0000H
Network No.
*2
1
Total stations 2
Group No. 0 (fixed)
Station No. 1
Mode
*3
Online
Network range assignment Refer to (b)
Refresh parameters
(Use default value)
Interrupt settings
Interlink transmission 
parameters
Routing parameters Refer to (c)
Item Set value
Setting 
necessity at 
GOT 
connection
Monitoring time 2000
LB/LW 
setting(1)
*1
LB
Station 
No.1
Start 0000
H
End 00FFH
Station 
No.2
Start 0100
H
End 01FFH
LW
Station 
No.1
Start 00000
H
End 000FFH
Station 
No.2
Start 00100
H
End 001FFH
LX/LY setting
*1
No setting
Specify I/O master station
*1
No setting
Specify reserved station No setting
Supplementary setting (Use default value)










