Specifications
5 - 20
5.5.2 Operation of demonstration machine
The confirmation is made by operating the demonstration machine for PLC 1 to 5 and
PLC 6.
The following gives each part application of the demonstration machine.
(1) For PLC 1 to 5
Host station link relay (B) sendT0 timer measurement start
(W400)
PLC 4
(W300)
PLC 3
(W200)
PLC 2
(W100)
PLC 1
(W0)
PLC 1
(B0)
PLC 6
(X2)
PLC 5
(B400)
PLC 3
(B200)
PLC 2
(B100)
PLC 4
(B300)
For PLC 1 to 5
(X20 X27)
PLC 6 PLC 5
• When X2 turns ON at PLC 6 (remote I/O station), Y76 flashes.
• When X3 turns ON at PLC 6 (remote I/O station), the digital switch values of
PLC 6 between X20 and X27 are displayed from X68 to X6F.