User`s guide

Table Of Contents
Project Transfer
Mitsubishi Electric, MA00759F 305
23.2 TCP/IP Transfer
When transferring through TCP/IP, you must select Use TCP/IP transfer under
Transfer/Communication Properties. When you click Send in the dialog Project
Tr a n s f e r the following dialog is shown.
Host address
Indicate the IP address of the operator panel you want to transfer to.
Terminal control port
Specify the TCP/IP port number for RUN/TRANSFER switching. Does not nor-
mally need to be changed. The default setting is 6001.
Transfer port
Specify the TCP/IP port number for the transfer (project transfer server). Does not
normally need to be changed. The default setting is 6000.
User ID
Specify a user name to be used to verify RUN/TRANSFER switching. Not used if
the operator panel is already in transfer mode.
Password
Specify a password to be used to verify RUN/TRANSFER switching. Not used if the
operator panel is already in transfer mode.
Save password in project
Saves the password and user name so that you will not need to give them next time.
Note:
Running other Windows programs at the same time as a project is transferred can lead
to communication errors. This is avoided by closing other programs. Links to signals will
be included when transferring blocks.