User`s guide
Table Of Contents
- E-Designer Reference Manual
- 1 Installation
- 2 General
- 3 Configuration with the Configuration Tool
- 3.1 Starting the Configuration Tool
- 3.2 Selecting Menu Language
- 3.3 Creating a Project
- 3.4 Saving a Project
- 3.5 Updating Drivers
- 3.6 Changing Project Properties
- 3.7 The Project Manager
- 3.8 The Block Manager
- 3.9 Showing Operator Panel around the Working Area
- 3.10 Configuration of Blocks
- 3.11 Using Text Blocks
- 3.12 Static Symbols
- 3.13 Changing I/Os
- 3.14 The I/O Browser
- 3.15 Changing BDTP Station
- 3.16 I/O Cross Reference
- 3.17 Other Managers/Editors
- 3.18 The File Menu
- 3.19 The Edit Menu
- 3.20 The View Menu
- 3.21 The Functions Menu
- 3.22 The Setup Menu
- 3.23 The Block Manager menu
- 3.24 The Object menu
- 3.25 The Layout Menu
- 3.26 The Project Menu
- 3.27 The Transfer Menu
- 3.28 The Window Menu
- 3.29 The Help Menu
- 4 Graphic Presentation and Maneuvering
- 5 Text-based Presentation for Printouts and Reports
- 6 Trends
- 7 Message Library
- 8 Alarm Management
- 9 Recipes
- 9.1 Calculation of Recipe Size
- 9.2 Recipe Properties and Recipe Directory
- 9.3 Creating a Recipe with the Operator Panel
- 9.4 Appending Recipes
- 9.5 Transferring Recipes to the Controller
- 9.6 Deleting Recipes
- 9.7 Using Recipes in a PC
- 9.8 Creating and Transferring Recipes with the Controller Program
- 9.9 Saving Individual Recipes on an External Memory Card in Runtime
- 10 Data Logger
- 11 Passwords
- 12 Printouts from the Operator Panel
- 13 Time Channels
- 14 Language Management
- 14.1 Unicode in the Operator Panel
- 14.2 Creating Additional Application Languages
- 14.3 Translating/Editing Texts in the Configuration Tool
- 14.4 Properties for the Application Language
- 14.5 Export
- 14.6 Import
- 14.7 Show Index
- 14.8 Cross Reference
- 14.9 Reuse Index
- 14.10 Font Templates
- 14.11 Unicode in E1012 and E1022
- 15 System Monitor
- 16 Index Addressing
- 17 Communication
- 18 Network Communication
- 19 Network Functions in the Operator Panel
- 20 LEDs
- 21 Function Keys
- 22 Macros
- 23 Project Transfer
- 24 Transfer of Controller Program and Parameters
- 25 Updating the Operator Panel

Network Communication
246 Mitsubishi Electric, MA00759F
Connect at boot
For PPP connections, the operator panel can automatically connect to another oper-
ator panel or PC at start-up.
PPP – Login verification method
Select method to validate the user identity. Does not normally need to be changed.
Accounts
Define who is allowed to access the services. See the section Network Accounts for
more information.
Act as
Select if the operator panel is to act as a PPP client and/or PPP server, i.e. if the op-
erator panel is to dial up a remote network or be dialed into from a remote host.
Modem
The parameters under Modem are indicated if the connection is made through a mo-
dem. Use a standard modem cable to connect to the modem.
Enable modem
Check if a modem is used.
Disconnect if idle (min)
Disconnects if the connection has been idle for the given number of minutes. 0
means that the connection is never disconnected.
Telephone number
State the telephone number to be dialed.
Modem setup string
String which initiates the modem. For further information, refer to the
documentation for the modem.
Setup/Peripherals
Select TCP/IP Connection placed on serial port and click Edit.
Now click the button Modem...