User`s guide
Adding new drives
3/4 FT1200 OWNER’S HANDBOOK
4. Check
before
sliding the device into the system, that any
device jumpers have been correctly set, for example, SCSI ‘ID’.
5. Carefully slide the new device into the bay from the front and
secure it with screws on both sides. Make sure that the front of
the device is aligned as close as possible to the front bezel.
6. Fit any control card into an appropriate expansion slot.
◊
Information is given in the following chapter about the
correct method of installing cards.
7. Connect a suitable power cable from one of the available
unused ones.
8. Follow any additional instructions provided as regards to signal
cables etc.
◊
A DAT drive may require a long ribbon cable to reach the
controller card fitted into a riser board slot.
9. After checking that no other cables have become dislodged or
trapped, refit the system panels.
10. Follow any additional installation instructions as given in the
units manuals, such as software or configuration requirements.