Technical information
Technician’s Handbook
198
Adding a Peripheral Cabinet
1. Install the peripheral cabinet (including Bay Power Supply, Bay Con-
trol Card, and required Fiber or Copper Interface Module).
2. Connect the fiber or copper cable to the interface module in the
control cabinet.
3. Power up the cabinet.
4. Enter CDE mode on the maintenance terminal.
5. Select Form 01, System Configuration and configure the new cards
(select node type as required).
6. Complete remaining CDE for the new cards.
Refer to Powering Up the Nodes (page 67).
Make sure there are enough devices available
(CDE Form 04, Option 103).










