Install Instructions
4 BAND COUPLING
1
2
4
3
TIGHTENING GUIDELINES:
4 Band Coupling:
1. Take the slack out of each clamp
by hand tightening inner bands
2
and
3
.
2. Take the slack out of each clamp
by hand tightening outer bands
1
and
4
.
3. Using the manufacturer’s
recommended calibrated torque
wrench (Seekonk NC-60), tighten
clamps alternately and rmly to
60 in/lbs. of torque, as in steps 1.
and 2. above.
2 BAND COUPLING
1
2
TIGHTENING GUIDELINES:
2 Band Coupling:
1. Take the slack out of each clamp by hand
tightening
1
and
2
.
2. Using the manufacturer’s recommended
calibrated torque wrench (Seekonk NC-
60), tighten clamps alternately and rmly
to 60 in/lbs. of torque, as in step 1.
Tightening Guidelines: (see 2 Band and 4 Band below)
Butt ends of no hub cast iron pipe or tting together inside the
gasket until both are rmly seated against the center stop of
gasket. Center the stainless steel shield assembly over the gasket.
Place Neoprene® gasket on no hub cast iron pipe or tting,
rmly seated against the raised stop mark of pipe or tting.
Place stainless steel shield assembly over the end of other pipe.
Ends of cut pipe must be smooth and square.
NEOPRENE
®
GASKET
RAISED STOP MARK
SHIELD ASSEMBLY
43
21
NO HUB COUPLING
Mission Rubber Company LLC
|
1660 Leeson Lane
|
Corona, CA 92879
USA
toll free
800.854.9991
fax
800.637.4601
missionrubber.com REV. 4/15
For joining hubless cast iron soil pipe or
tting in sanitary and drain waste and
vent applications.
NH
NO HUB
Coupling
INSTALLATION INSTRUCTIONS
STANDARD NO HUB COUPLING