Install Instructions

4 BAND COUPLING
1
2
4
3
TIGHTENING GUIDELINES:
4 Band Coupling:
1. Take the slack out of each clamp
by hand tightening inner bands
2
and
3
.
2. Take the slack out of each clamp
by hand tightening outer bands
1
and
4
.
3. Using the manufacturer’s
recommended calibrated torque
wrench (Seekonk NC-60), tighten
clamps alternately and rmly to
60 in/lbs. of torque, as in steps 1.
and 2. above.
2 BAND COUPLING
1
2
TIGHTENING GUIDELINES:
2 Band Coupling:
1. Take the slack out of each clamp by hand
tightening
1
and
2
.
2. Using the manufacturer’s recommended
calibrated torque wrench (Seekonk NC-
60), tighten clamps alternately and rmly
to 60 in/lbs. of torque, as in step 1.
Tightening Guidelines: (see 2 Band and 4 Band below)
Butt ends of no hub cast iron pipe or tting together inside the
gasket until both are rmly seated against the center stop of
gasket. Center the stainless steel shield assembly over the gasket.
Place Neoprene® gasket on no hub cast iron pipe or tting,
rmly seated against the raised stop mark of pipe or tting.
Place stainless steel shield assembly over the end of other pipe.
Ends of cut pipe must be smooth and square.
NEOPRENE
®
GASKET
RAISED STOP MARK
SHIELD ASSEMBLY
43
21
NO HUB COUPLING
Mission Rubber Company LLC
|
1660 Leeson Lane
|
Corona, CA 92879
USA
toll free
800.854.9991
fax
800.637.4601
missionrubber.com REV. 4/15
For joining hubless cast iron soil pipe or
tting in sanitary and drain waste and
vent applications.
NH
NO HUB
Coupling
INSTALLATION INSTRUCTIONS
STANDARD NO HUB COUPLING

Summary of content (1 pages)