Operator`s manual
Badger II Power Supply Operator’s Manual
Rev. 05/11/2012 Mission Power Solutions (760) 631-6846 sales@mpwrs.com Pg. 2
Badger II Power Supply
AC-DC Switcher
―Quick Install‖ Instructions
The Badger can be mounted on either of two sides. Use #8-32 mounting screws. Maximum penetration
should not exceed 0.18″ (4,5 mm).
Maintain 2″ (50,8 mm) clearance at either end for airflow.
Output Connections
Installing ring lugs and/or bus bars on single output card studs:
The right stud is Positive and the left stud is the Return on single output
cards.
Remove the nut and place ring lug over output stud.
Replace and tighten the nut to a torque of 10 in/lbs. Do not over-
tighten nuts.
Installing power connectors on dual output cards:
J3-A1 is Positive for output 1 (lower connector); J3-A2 is the Re-
turn. J4-A1 is Positive for output 2 (upper connector); J4-A2 is the
Return. For complete pin assignment, see page 9.
Use ITT/Cannon mating receptacle P/N DAM7W2PK87 with pins
P/N DM53745-1 or equivalent.
Installing power connectors on quad output cards:
J3 is a 16-pin Positronics power connector. For complete pin
assignment, see page 9.
Use Positronics mating connector P/N PLB16M7000 with pins
P/N MC112N.
Attach 12 AWG wire.
Output
Return
Output
J3
1
8
16
9
J3
Figure 1. Single (Maxi Module)
Output Terminals
Figure 2. Dual (Mini Modules) Output
Connector
Figure 3. Quad (Micro Modules)
Output Connector
J3/J4
Mounting the Badger II Power Supply