Installation Sheet

PAGE 12
Step 3
Drill the 6 marked locations. Drill holes as described on page 4.
Step 4
Insert the SCV960 hold-downs on the bottom of the wall jambs, slide it up to about 1 inch below
the pre-drilled hole, and use tape to temporarily hold them up and keep them out of the way.