COVE PIVOT 1/4" SEMI FRAME LESS DOOR AND PANEL MIN ENO) Ta COPY THE MODEL NUMBER FOR YOU RECORDS HERE # READ THE INSTRUCTIONS CAREFULLY, familiarize yourself with all the parts as shown in the exploded view. The exploded view will also provide a helpful reference when relating to the location of the various parts and how they are mounted.
COVE PIVOT 1/4" SHAMELESSNESS DOOR AND PANEL PARTS LIST, and Oo ®@ fam WALL PLUG (6 pos) SCREW 1 1128508) SCREW.
COVE PIVOT 1/4" SHAMELESSNESS DOOR AND PANEL STEP 1 Sef the level on the walls fo ensure that they are plum, then set the wall jambs §3 in place and mark this hole locations. STEP 3 Set wall jambs (3) in place and screw (@ into the walls, ET BORE ¥ 152° STEP 2 Next doll holes in the wall and using a rubber mallet, insert the wall plugs (1). Step Acrylic 8 Fiberglass Shower Enclosures Using: 18 ‘inch drill bit, ¢¥ill @ hole about F412 inch poet al pate of the previously marked locations.
COVE PIVOT 1/4” SHAMELESSNESS DOOR AND PANEL {house whether you will need to assemble your shower door to open from the right-or left. Follow the appropriate diagram below, Right Pivot Assembly STEP 4 Connect magnetic wall jamb 6 to the top and bottom frack (3 with aluminum gasket {7} and S Crews © . the screws get attached from the back stoke of the jamb nto the top and bottom.
COVE PIVOT 1/4" SHAMELESSNESS DOOR AND PANEL Right Pivot Assembly Left Pivot Assembly STET 8 Lift entire frame assembly into opening and push ends coward fo engage wall jambs. Use @)scrawniness top and bunion frame fo 66K assembly i place. STEP 8 Lift entire frame assembly into opening and plash ends outward to engage well jambs. Use @)screw on tp and bottom frame to look assembly in place. J Fi ids worn § BORN STET 8 Tit door panel (3 slightly into ths shower.
COVE PIVOT 1/4* SHAMELESSNESS DOOR AND PANEL STEP 8 Attach magnetic door plastic fo cit site of STEP 10 Make adjustments fi fit opening, add glass door panel © . Next, attach Pivot side splash guard Wh sores (1) into the frame work and cover strews 18 apposite end of glass and Sweep §3) on the nation, with caps(d). (@geyser 3 STEP 11 CAULK ALL SIDES. 24 FINAL STEP: Caulk the inside sides of the shower font frame (0 seal; Keep the lenitive ares dry fora unit bf 24 hods, Your installation is tow complete.