Installation Sheet

QCI-5307 Rev 0 Page 6 Cered 01/05/17
1 Determine location of the unit centerline on the
threshold. From unit centerline mark location of panel
centerline 1” towards outside of shower. Next, mark a
continuous panel centerline on the wall the panel will
mount to, starting where the threshold centerline meets
the wall. Use a level to ensure the wall centerline is
plumb and straight. The wall centerline should be a mini-
mum of the unit height from the threshold.
NOTE: The unit centerline for this unit does NOT get
anything mounted to it. The Panel and Guide center-
lines are 1” from the unit centerline.
This unit requires a minimum 3” of flat curb to be in-
stalled correctly.
2 Cut the threshold U-channel to the appropriate size. This piece of U-channel will be
equal to the opening width. Next drill three 3/16” diameter holes in the center of U-
channel (centerline groove provided for convenience), two holes approximately 6” from
each end and one in the middle. Place the U-channel in its correct position with the u-
channel centerline over the threshold centerline as marked in step one.
With a pencil carefully mark each hole position on the threshold centerline. Remove the
u-channel and drill a 3/16” diameter hole, approximately 1” deep, directly on the thresh-
old centerline at the marked
locations.
Note: It is critical that the
threshold U-Channel is
centered on the PANEL
centerline.
3” Minimum Curb
1 1/2”
Panel Centerline
Unit Centerline
1”
1”