COPY THE MODEL NUMBER FOR YOU RECORDS HERE # Customer Service 1-855-480-2915 READ THE INSTRUCTIONS CAREFULLY, familiarize yourself with all the parts as shown in the exploded view. The exploded view will also provide a helpful reference when relating to the location of the various parts and how they are mounted. Left Hand Install 2018 Miseno Chico, California 95928 1-855-480-2915 www.miseno.
Customer Service 1-855-480-2915 15 1 10 14 Screw 1 9/16" (8 pcs) 5 11 2 Screw 1 3/4" (3 pcs) 16 5 3 12 13 4 5 17 16 6 7 18 8 9 19 20 21 26 22 27 23 28 24 29 25 1
Customer Service 1-855-480-2915 PART LIST Aluminum Cap (1 pc) Wall Jam (1 pc 1741mm 1385mm 68 1 2" 54 1 2" 1755mm 1399mm 69" 55" Water- etaining eal (1 pc) Water- etaining eal (1 pc) queeze asket (1 pc) Moving oor (1 pc) Fixed anel (1 pc) Screw 1 9 16" (8 pc ) Top ail (1 pc) Track Screws (2 pcs) 17 16 Wall nchor (11 pcs) Top Rollers (2 pcs) 18 1870mm 1514mm 73 1 2 59 1 2 Rail all racket Kits (1 pc) Cap for ar (1 pc) 21 20 19 Roller umper (1 pc) Screw 1 3/4" (3 pcs) Anti- umper (
Customer Service 1-855-480-2915 Choose you will need to assemble your shower door Follow the appropriate diagram below. Left Hand Assembly STEP 1 1.Installation Measurement. 43 1/4"- 47 1/4"(1099-1200mm) 55 1/4"- 59 1/4"(1403-1504mm) Right Hand Assembly STEP 1 1.Installation Measurement.
Customer Service 1-855-480-2915 Choose you will need to assemble your shower door Follow the appropriate diagram below. Left Hand Assembly Right Hand Assembly STEP 2 STEP 2 1. 1.Put & level wall jamb(2) at the installation position, then mark the drilling hole. 2.Drill hole with 1/4" drill bit. 3.Put wall anchor(6) into the hole. 2. 3.
&XVWRPHr 6HUYLFe Left Hand Assembly Right Hand Assembly STEP 3 STEP 3 1.,QVHUW ¿[HG SDQHO LQWR ZDOO MDPE VORW WKHQ OHYHO LW XVH 6KLP WR 1.,QVHUW ¿[HG SDQHO LQWR ZDOO MDPE VORW WKHQ OHYHO LW XVH 6KLP WR DGMXVW LI ¿[HG SDQHO LV XQOHYHO DGMXVW LI ¿[HG SDQHO LV XQOHYHO ,QVHUW VTXHH]H JDVNHW WR LQVLGH RI WKH VKRZHU WR SUHVV WKH ¿[HG ,QVHUW VTXHH]H JDVNHW WR LQVLGH RI WKH VKRZHU WR SUHVV WKH ¿[HG SDQHO DJDLQVW ZDOO MDPE E\ XVLQJ LQVWDOODWLRQ WRRO
Customer Service 1-855-480-2915 Left Hand Assembly Right Hand Assembly STEP 4 1.Note: f installation dimension is between STEP 4 1.
Customer Service 1-855-480-2915 Left Hand Assembly Right Hand Assembly STEP 5 1.Install roller bumper(15) on top rail(10). 2.Cover cap for bar(14) at the end of top rail(10). 3.Fix top rail(10) on ¿[Hd panel(4) with track screw(11), and level top rail(10). 4.Draw drilling hole position of rail wall bracket kits(13). STEP 5 1.Install roller bumper(15) on top rail(10). 2.Cover cap for bar(14) at the end of top rail(10). 3.Fix top rail(10) on ¿[Hd panel(4) with track screw(11), and level top rail(10). 4.
Customer Service 1-855-480-2915 Left Hand Assembly STEP 6 1. Drill hole with 1/4" drill bits on wall. 2. Put wall anchor(6) into the hole. 3. Fix rail wall bracket kits(13) with screw 1 3/4" , then tighten the set screw. 1 6mm 1/4" 3 Right Hand Assembly STEP 6 1. Drill hole with 1/4" drill bits on wall. 2. Put wall anchor(6) into the hole. 3. Fix rail wall bracket kits(13) with screw 1 3/4" , then tighten the set screw.
Customer Service 1-855-480-2915 Left Hand Assembly Right Hand Assembly STEP 7 1. Mark hole on the WUD\ ÀRRr for bottom guide. 2. Use 1/8" drill bit drill through 3. Fix bottom guide to the WUD\ ÀRRr 4. Insert gasket (22) into the threshold (24) STEP 7 1. Mark hole on the WUD\ ÀRRr for bottom guide. 2. Use 1/8" drill bit drill through 3. Fix bottom guide to the WUD\ ÀRRr 4. Insert gasket (22) into the threshold (24) Before door guide installation, please make sure it's at the right direction.
Customer Service 1-855-480-2915 Left Hand Assembly Right Hand Assembly STEP 8 1.Install top rollers(12), 180°magnetic seal short(18) and water-retaining seal(8) on moving door(9)DŽ STEP 8 1.
Customer Service 1-855-480-2915 Left Hand Assembly STEP 9 1.Hang moving door(9) on top rail(10). 2.Tighten anti-jump(17) onto the moving panel(9) 1 Right Hand Assembly STEP 9 1.Hang moving door(9) on top rail(10). 2.
Customer Service Left Hand Assembly Right Hand Assembly STEP 10 1. ,QVWDOO ZDWHU UHWDLQLQJ VHDO DW VLGH RI ¿[HG SDQHO 2. ,QVWDOO KDQGOH RQWR GRRU SDQHO 1 STEP 10 1. ,QVWDOO ZDWHU UHWDLQLQJ VHDO DW VLGH RI ¿[HG SDQHO 2.
Customer Service 1-855-480-2915 Left Hand Assembly STEP 11 1. Adjust moving door(9).If door panel does not close properly, please adjust roller (by lifting it up or turning it downward), until door panel can be closed properly as shown below. ±3 ±1/8" Inside of shower Right Hand Assembly STEP 11 1. Adjust moving door(9).If door panel does not close properly, please adjust roller (by lifting it up or turning it downward), until door panel can be closed properly as shown below.
Customer Service 1-855-480-2915 Left Hand Assembly Right Hand Assembly STEP 12 1. lnstall magnet(18) to the door panel,close against the wall to mark the installation position of magnetic aluminum(21). 2 Put magnetic aluminum(21) at the installation position, then mark its drilling hole position 3.Drill hole with 1/4" drill bits. 4.Put wall anchor(6) into the hole. 5.Fix magnetic aluminum(21) with screw 1 9/16" (5) against wall. STEP 12 1.
Customer Service 1-855-480-2915 Left Hand Assembly STEP 13 1.Place aluminium cap (1) onto the wall jamb (2) . 2.Caulking,and not allow to open & close the door within 24 hours. Right Hand Assembly STEP 13 1.Place aluminium cap (1) onto the wall jamb (2) . 2.Caulking,and not allow to open & close the door within 24 hours. 1 1 + FINAL STEP:Caulk the inside sides of the shower door frame to seal. Keep the entire area dry for a minimum of 24 hours. Your installation is now complete.