1o0ls 5mm T 4mm \ i ME Bmm f-"" 6 drill bits ; C 28 drill bits Hex key Install rod Positioned Drill and Assorted Bits ~ Knife Pencil £ S Caulk Gun Masking Taps Claw Hammer Assorted 8" {1.8m) Screwdrivers Before You Begin CAUTION: Risk of personal injury: Alias safety glasses while cutting or drilling. CAUTION: Risk of injury or product damage. Unframed tempered chase should not contact hard surfaces or it may shatter. Do not ouch the edge of the tempered glass panel with tools or any hard objects.
Lhotse (ne shower Door open direction left or right. Follow the appropriate diagram below . Left Hand Assembly Right Man Assembly B STEP 1: Install rollers to door. Pick up the riflers from the package, install them to door panel as lust rated, fastens by Hex key 4mm.
3 4 Put the door panel in the inside of your shower room and have the wood blocks up the bottom as illustrated. STEP 3 Use a professional level and the positioned provided to determine the wall shields position as illustrated.
o FEE 40 Drill holes for wall channel with Emil drill bit. Drill holes for wall bracket with 8mm drill bit. @8 drill bit STEP & install the wall plugs.
S b install the wall channel. Fasten the wall channel according to the holes fathomable steps by ST3.5x35 screws. install the wall bracket. The wall bracket has two parts, now takeout inner part-the bracket base which like the pics shown Bracket base tends to slip down on the single mounting screw.
o e B Drill holes for Bottom track with mimic drill bit. 26 drill] bits @16 drill bits STEP 9 install the wall plugs.
> T Install the Bottom track. Fasten'the backtrack according to the holes as abase steps by 8T3.
S 1d Install the fixed panel. Put the fixed panel into the Bottom track and the Wall channel. STET 13 Measure and Cut the Running Rail. Measure from wall to wall at the lop of the shower door opening. Mark the running rail at the determined distance. Cut from gnd, Cut the rough edges smooth where the running tall was cul. Taking care to avoid damaging finished surfaces.
o e 140 Install the stoppers. Position the stoppers on the fining rail, secure them temporarily in place. Do not fasten them, fasten it after install the fixed panel and glass panel. Loose the glass holders. The glass holders has beer install to the running rail Loose it by Install rod. This for install the fixed pans. Position the outer part of wall brackets on the raining rail, Secure them temporarily in place. Hex key 2.5mm _ e SR Hex key 4mm STEP 15: Hex key 2.5mm Hex key 4mm Fasten the running rail.
o |k 10l Install the bottom guide. Use positioned to determine the bottom:guiide’s position: as illustrated 1.. Di ill holes with 8 drill bit as frustrated 2. Fasten the bottomless according to the holes from above steps by &8 wall plugs and screws, as illustrated 3 &4. Check the bot torn gulls, Puttee black rubber to 10mim position. This bottom guild fit for 3 different thickness, Secure the thickness is for 10mm glass. Fasten the bottom guild as illustrated. STEP 17: Install the door panel.
o e el Install the handle as illustrated. Install the door gasket and gap gaskets. Insert the-door gasket to the wall side, And insert another gap gasket fo another side of glass door: insert another gap-gasket to the fixed panel. Cut the gap gaskets Cut the gap gaskets as illustrated. as illustrated. Install the Glass fix nails as Illustrated. NN Measure and Cut the Bottom track cover. Measure from wall fo fixed pane at the bottom track. Mark the Bottom track cover at the determined distance, Cut fem end.