Installation Sheet
PAGE 3
• Flathead Screws, 1-5/8”
• Wood Shims
• Construction Adhesive
• Mortar Compound (optional)
• Drain Assembly
• Silicone Caulk for Drain
NOTE: Drain not included
• Level
• Jigsaw
• Tape Measure
• Pencil
• Power Drill
• Safety Glasses
• 1/8” Drill Bit
Tools Needed Supplies Needed
Starting Your Installation
To ensure the base is the correct color, peel away the blue protective film from base
edges. Leave remaining film until installation is complete to protect product finish.
Allow the base to reach room temperature before installation.
Read installation instructions carefully before starting project.
Keep instructions for warranty information.
Do not use plumber’s putty, as it may result in product failure. Use a high-grade
silicone caulk or latex sealant for all necessary locations.






