Installation Guide
COL
HOT
ON
60 sec 
crack or break the copper mounting post.
complete tightening. Do not overtighten, which can 
wrench to give the lock nut no more than a ¼ turn to 
Hand tighten, then use an adjustable Important: 
tightening. 
sealant or plumber’s tape to the threads before 
labels on the supply posts. Apply a bit of thread 
connecting the hot and cold in accordance with the 
supply posts on the faucet. Ensure that you are 
6. Attach your main water lines to the copper water 
weight together and tighten the screws to secure.
mounted at this location. Clamp the two sides of the 
from the faucet body. The weight will need to be 
From beneath the counter, measure 15” down the hose 
by removing the two screws with a Phillip’s screwdriver. 
5. Disassemble the provided hand sprayer hose weight 
check for any leaks. 
allow the sprayer to run for another 60 seconds, and 
running properly. Turn on the hand sprayer function and 
leaks. Check to ensure that both hot and cold water are 
8. Turn the faucet on and ensure that there are no 
any leaks underneath.
supply back on from underneath your sink. Check for 
7. Once installation is complete, turn the main water 
2
    KITCHEN FAUCET INSTALLATION
 Kitchen Faucet Installation Instructions


