Installation Guide

Table Of Contents
1 2
4
1
5
2
3
2- 2-Ø2 Ø25Max
102
3
Valve
Hot water
Valve
Cold water
Hose
4
5
Pop-up
Disassemble Pop-Up
Firmly hand tighten nut
Connect to Drain
Push to activate
Drain
1.Please confirm the two holes on the basin are through holes
as shown from the instructions before install.First,remove all
fixing sets from the fixed group,and then put the body through
the hole on the basin,assemble all fixing sets to the body.
2.Use hand to screw up the locknut.
3.Connect the inlet hose as shown, take note of the "Red"
& "Blue" index from the handle,"Red" for connecting to
the valve for supply hot water, and "Blue" for connecting
to the valve for supply cold water.
4.Install the pop-up.