Operating instructions

Vertigo XG Installation & Quick Start Guide 2-7
Installation and quick start instructions
Mounting the Vertigo XG chassis in a rack
Included in the shipping package is a Rack mounting kit, which contains the rails, screws
and washers required to mount the Vertigo XG chassis into an equipment rack. Note that
the rails are designed to fit in racks with a depth of 28” to 33”. Due to the heavy weigh of the
unit, the rack in which the Vertigo XG unit will be installed should be anchored to the
building’s structure.
CAUTION
Vertigo XG devices are intended to be installed in a restricted access location by qualified
personnel. All health and safety regulations and precautions must be observed.
The following procedure provides step-by-step instructions for installing the rails and
mounting the Vertigo XG chassis into an equipment rack.
To install chassis rails:
1. Remove the Vertigo XG faceplate by pulling the faceplate’s handles away from the chassis.
2. Included in the shipping package are a pair of rail assemblies. In each rail assembly,
locate the inner rail and outer rail.
Press the locking tab to release the inner rail from its locking position and pull out the
inner rail from the rail assembly. (The inner rails are to be attached to the chassis and
the outer rails are to be installed in the rack).