Setup guide
Table Of Contents
- Introduction to iControl Edge
- System Requirements
- Installation and Setup
- Key Concepts
- Task 1: Preparing to Install an iControl Edge System
- Task 2: Installing the iControl Application Server
- Task 3: Preparing a PC for Configuring the Application Server
- Task 4: Configuring the Application Server
- Task 5: Installing & Configuring EdgeVision Devices
- Task 6: Installing & Configuring Densité Systems
- Task 7: Installing & Configuring GC-100 Network Adapters
- Task 8: Installing Set-Top Boxes
- Task 9: Installing & Configuring Allégro Systems
- Task 10: Verification & Readiness Check
- Task 11: Managing the iControl Edge Configuration Files
- Task 12: Uploading and Applying iControl Edge Configuration Files
- Key Concepts
- Troubleshooting
- Installing PuTTY
- Using WinSCP
- Contact Us!

Installation and Setup
Power Cycling (through TCP/IP) a Set-Top Box
66
2. Connect an RCA cable to the appropriate audio connectors from the back of your set-top
box to the back of the appropriate audio probe in your Densité frame (refer to the
documentation for your specific set-top box model and Densité probe).
Power Cycling (through TCP/IP) a Set-Top Box
If your Set-Top Box is powered with an APC7900 power bar, and your spreadsheet is configured
with the appropriate APC7900 information (in the PDU section), you will be able to remotely
power-cycle your STB simply by clicking the Reboot button ( ). The Reboot button is in
two locations in iControl Edge:
• Beside the player in the Multi-Channel Monitoring area
• Beside the STB icon in the Application Browser when in Remote Control view.
Task 9: Installing & Configuring Allégro Systems
IMPORTANT: Perform this task only if you are NOT installing an EdgeVision for the purposes of
processing and monitoring video streams over IP.