Operating instructions

3-6 Intuition XG Installation & Quick Start Guide
Installation instructions for the Intuition XG-3U/Dual
Mounting the Intuition XG-3U/Dual chassis in a rack
Included in the shipping package is a Rack mounting kit, which contains the rails, screws
and washers required to mount the Intuition XG chassis into an equipment rack. Note that
the rails are designed to fit in racks with a depth of 28” to 33”. Due to the heavy weigh of the
unit, the rack in which the Intuition XG unit will be installed should be anchored to the
building’s structure.
CAUTION
Intuition XG devices are intended to be installed in a restricted access location by
qualified personnel. All health and safety regulations and precautions must be observed.
The following instructions provide step-by-step instructions for installing the rails and
mounting the Intuition XG chassis into an equipment rack.
To install chassis rails:
1. Remove the Intuition XG faceplate by pulling the faceplate’s handles away from the chassis.
2. Included in the shipping package are a pair of rail assemblies. In each rail assembly,
locate the inner rail and outer rail.
Press the locking tab to release the inner rail from its locking position and pull out the
inner rail from the rail assembly. (The inner rails are to be attached to the chassis and
the outer rails are to be installed in the rack).
Pull out the inner rail
(to be attached on the chassis)
Press the Locking tab
Outer rail (to be installed in the rack)