User`s manual
Checklist
29
Checklist
Monitor Wall Actions
Follow these steps to complete all the tasks required for operating the Kaleido-X Monitor Wall:
1. Log into a Monitor Wall. Refer to “Logging into the Monitor Wall” on page 28.
2. Load a Layout. Refer to “Loading a Layout” on page 28.
3. Load a Layout from RCP-2 and Mouse. Refer to “Loading a Layout using the RCP-2 and Mouse” on page
30.
4. Load a Layout from Third party Applications. Refer to “Loading a Layout from Third Party Applications”
on page 33.
5. Execute Actions. Refer to “Executing Actions” on page 33.
6. Describe Layout Components. Refer to “Describing Layout Components” on page 33.
7. Assign a Source to a Monitor. Refer to “Assigning a Source to a Monitor” on page 33.
8. Display a Source Fullscreen. Refer to “Displaying a Source Fullscreen” on page 35
9. Control an External Routing Switch. Refer to “Controlling an External Routing Switch” on page 36
10. Refresh a Layout. Refer to “Refreshing a Layout” on page 36.
11. Assign a Channel to a Widget. Refer to “Assigning a Channel to a Widget” on page 37.
12. Invoke an Action. Refer to “Invoking an Action” on page 38.
13. Change a Crosspoint. Refer to “Changing a Crosspoint” on page 39.
14. Toggle the Safe Area. Refer to “Toggling Safe Areas” on page 40.
15. Change the Aspect Ratio. Refer to “Changing the Aspect Ratio” on page 41.
16. Edit a Text. Refer to “Editing Text” on page 43.
17. Trigger a GPI Out. Refer to “Triggering a GPI Out” on page 44
18. Obtain an IP Address and System Name. Refer to “Obtaining IP Addresses and System Names” on page
45
Kaleido-X User's Manual.book Page 29 Friday, August 24, 2007 4:39 PM