User guide

12
9. For Rear Entry Supplies Only:
a) Fit the concealing plates over the inlet
pipes.
Note! Apply silicone sealant to the back
face of the ange.
Apply Silicone Sealant
Concealing Plate
10. Caution! It is essential at this point
that the supply pipework is thoroughly
ushedthroughbeforeconnectiontothe
mixer. Failure to do so may result in product
malfunction and will not be covered under the
guarantee.
11. Fit the compression nuts and olives onto the
pipework.
12. Align the mixer with the pipework and t onto
the backplate.
Important! Make sure that the hot and cold
inlets on the mixer correspond with the hot and
cold inlet supplies.
13. Tighten the compression nuts onto the mixer
with a suitable wrench.
Caution! Take care not to damage the chrome
surfaces.
14. Tighten the grubscrews to secure the mixer to
the backplate.
15. Fit the shower ttings, refer to your shower
fittings installation and user guide for
instructions.
Important! For high pressure systems (above
0.5 bar) make sure that the ow regulator
(supplied) is tted, refer to section: ‘Flow
Regulators’.
16. Turn on the hot and cold water supplies and
check for leaks.
17. Before using the shower, refer to section:
‘Commissioning’.
Compression Nut
Olive