User`s manual

SNMP-NV6
Page 24
If you only want to shutdown the UPS mark the UPS Shutdown Delay check box and fill
in the delay time.
If you only want to restart the UPS mark the UPS Restart Delay check box and fill in the
delay time.
If you want to perform both the shutdown and the restart mark both of the check boxes
and fill in both of the delay times.
5.5.2.3 Smart Shutdown
The Smart Shutdown feature is used to shutdown all of the connected computers and the
UPS safely.
First you should estimate the longest OS shutdown time of your operating systems,
which have the shutdown software installed and are connected to this card. The card will
delay the assigned OS shutdown time until all of the operating systems are shutdown by
the shutdown software then sends the UPS the shutdown command.
5.5.2.4 Outlet Control
Press the Switch Bank button to control the UPS output relay to turn on or off the outlet
banks.
5.5.2.5 Power Fail/Restore Simulation
Pressing one of the buttons causes the card to simulate the UPS power fail or power
restore event. Based on this function, we can test all of the connected software to verify
whether they work properly or not. The UPS will remain in its original state and will not
go to the battery mode.
5.5.3 Weekly Schedule
This menu allows you to modify the parameters of the shutdown/restart/test events
associated with the days of the week.