User`s manual
31
3. RPM Schedule
This screen is for scheduling the RPM’s outlets to perform a specific Action (Fig. 46). To add a new schedule,
select the “New” button. To make changes to the current schedule, select
[Edit]
. To remove a schedule, select
[Delete]
.
Fig. 46-RPM Schedule Screen
After selecting the “New” button or
[Edit]
, the following screen will appear (Fig. 47). Select the desired shutdown
and restart configuration and then click the
Save
button.
•
RPM: The user can select which RPM to perform the Action (RPM01-RPM16).
•
Outlet: The user can select which outlet to perform the Action.
•
Outlet Action: The user can select to turn on the RPM’s outlet or turn off the RPM’s outlet.
•
Date: The user can configure the RPM to perform the Action ‘Once’ on the specified date (format:
mm/dd/yyyy) or the RPM can be configured to perform the Action ‘Every’ week on the specified day.
•
Time: The user can select the time of day to perform the Action (format: 24-hour).
Fig. 47-New Schedule Event Screen