User`s manual
15
Figure 3 - First, second and third RPM
13. Make sure that the third RPM has the Terminator plugged into the iLink port.
14. Remove the Terminator from the second RPM.
15. Connect the second and third RPM together with the iLink cable.
16. Plug the third RPM's power cord into utility power.
17. Turn the master power switch on.
18. Configure the third RPM's ID number (see the SNMP-32 User’s Manual).
NOTE:
Each RPM must have it's own unique ID#, the default ID# is "0".
19. If there are only three RPMs required for this application, then this completes the
Daisy Chaining procedure and the RPMs are ready for use.
20. If your application requires additional RPMs (maximum of sixteen), then repeat
steps 13-19 of the Daisy Chaining procedure.