Specifications

DFCM FORM 7a 042413
6
Multi-Step Bidding Process Stage II
Page No. 2
7. Licensure
The Contractor shall comply with and require all of its Subcontractors to comply with the license laws as required
by the State of Utah.
8. Permits
In concurrence with the requirements for permitting in the general conditions, it is the responsibility of the
contractor to obtain the fugitive dust plan requirements from the Utah Division of Air Quality and the SWPPP
requirements from the Utah Department of Environmental Quality and submit the completed forms and pay any
permit fee that may be required for this specific project. Failure to obtain the required permit may result in work
stoppage and/or fines from the regulating authority that will be the sole responsibility of the contractor. Any delay
to the project as a result of any such failure to obtain the permit or noncompliance with the permit shall not be
eligible for any extension in the Contract Time.
9. Time is of the Essence
Time is of the essence in regard to all the requirements of the contract documents.
10. Bids
Before submitting a bid, each bidder shall carefully examine the contract documents; shall visit the site of the work;
shall fully inform themselves as to all existing conditions and limitations; and shall include in the bid the cost of all
items required by the contract documents including those added via addenda. If the bidder observes that portions
of the contract documents are at variance with applicable laws, building codes, rules, regulations or contain obvious
erroneous or uncoordinated information, the bidder shall promptly notify the DFCM Project Manager. Changes
necessary to correct these issues will be made via addenda issued by DFCM.
Bids are to be submitted electronically through a secure mailbox BidSync (www.bidsync.com
) until the date and
time on the Project Schedule. It is the sole responsibility of the contractor to ensure their bid reaches BidSync
before the closing date and time. There is no cost to the contractor to submit electronic bids via BidSync.
Electronic bids may require the uploading of electronic attachments. The submission of attachments containing
embedded documents (i.e., zip files, .mov, wmp, and mp3 files, etc.) is prohibited. All documents should be
attached as separate files.
A bid bond properly signed by a qualified surety, as indicated on the DFCM Bid Bond form provided along with
this Instruction to Bidders, in the amount of 5% of the bid, shall accompany the bid submission and uploaded in
BidSync. If the bid bond is not furnished with the bid through Bidsync, the BID is NONRESPONSIVE.
THIS BID BOND MUST BE ON THE DFCM BID BOND FORM PROVIDED WITH THIS INSTRUCTION TO
BIDDERS IN ORDER TO BE CONSIDERED AN ACCEPTABLE BID unless only one bid is received by
DFCM, or the failure to comply with the bid bond requirements is determined by the Director of DFCM to be
nonsubstantial based on the following:
A. the bid bond is submitted on a form other than DFCM’s required Bid Bond form and the bid bond meets
all other requirements including being issued by a surety firm authorized to do business in the State of
Utah and be listed in the U.S. Department of the Treasury Circular 570, Companies Holding Certificates
of Authority as Acceptable Securities on Federal Bonds and as Acceptable Reinsuring Companies for an
amount not less than the amount of the bond to be issued. A co-surety may be utilized to satisfy this
requirement; and
Bid DA14027DFCM
5/30/2014 2:08 PM p. 9