Specifications
Draper Prison Wasatch & Oquirrh Intercom & Paging System Remodel 4-21-2014
ELECTRICAL DEMOLITION 260080 – 1
SECTION 260080 – ELECTRICAL DEMOLITION
PART 1 – GENERAL
1.1 RELATED DOCUMENTS:
A. Drawings and general provisions of Contract, including General and Supplementary Conditions
and Division-1 Specification Sections, apply to work of this section.
B. This section is a Division 26 General Provisions section, and is part of each Division 26, 27, and
28 sections making reference to electrical demolition.
1.2 DESCRIPTION OF WORK:
A. Extent of electrical demolition work is indicated by drawings.
B. Electrical demolition items are shown to give a basic description of the extent of demolition
work, but may not be inclusive.
C. Do not assume that the electrical drawings reflect as-built conditions. Visit and observe the
project prior to submitting bid and determine extent of electrical demolition work.
1.3 QUALITY ASSURANCE:
A. Standards: Refer to Section 260001 - Electrical General Provisions as applicable.
PART 2 – PRODUCTS - Not Used.
PART 3 – EXECUTION
3.1 GENERAL:
A. Demolition work shall be laid out in advance to eliminate unnecessary cutting, drilling,
channeling, etc. Where such cutting, drilling, or channeling becomes necessary, perform with
care, use skilled mechanics of the trades involved. Cutting work of other contractors shall be
done only with the consent of that contractor. Cutting of structural members is not permitted.
Repair damage to building and equipment as a result of electrical demolition work under this
contract at no additional cost to owner.
B. Obtain permission from the architect before penetrating any ceiling, floor, and wall surfaces.
3.2 METHODS:
A. Disconnect and remove any/all fixtures, devices, equipment, etc. required for proper completion
of the work whether shown or not.
B. Relocate, rewire, and/or reconnect any/all fixtures, devices, equipment, etc. that for any reason
obstructs construction.
Bid DA14027DFCM
5/30/2014 2:08 PM p. 72










