Specifications
Draper Prison Wasatch & Oquirrh Intercom & Paging System Remodel 4-21-2014
ELECTRICAL GENERAL PROVISIONS 260001 – 6
been issued and signed by the Owner or his designated representative. The Contractor shall
bear all costs associated with proceeding on any change order that has not been approved by
the Owner or his designated representative.
B. Any damages caused by construction delays due to frivolous RFI’s, will be born solely by the
Contractor.
3.3 SAFETY PRECAUTIONS:
A. Provide all necessary guards or construction barriers and take all necessary precautions to
insure the safety of life and property.
3.4 CLEAN:
A. Clean up all equipment, conduit, fittings, wire, packing cartons, plastic, and other debris that is a
direct result of the installation of the work of this division, both during the execution, and at the
conclusion, of the project. Keep the site clean and safe during the progress of the work. Clean
fixtures, interior and exterior of all equipment, and raceways prior to final acceptance. Vacuum
interior of all electrical panels and equipment. Correct any damaged equipment. Touch-up or
repaint if necessary.
3.5 TEMPORARY POWER:
A. Make arrangements with the proper institution authority for all temporary electricity.
B. Provide temporary power, complete with metering and wiring for lighting and power outlets for
construction tools and equipment. Report the initial meter reading to the owner/institution, or
otherwise as may be directed.
C. Service shall be provided with a main disconnect and all 20 ampere receptacles protected by 20
amp GFI, single-pole breakers. No attempt is made herein to specify construction power
requirements for equipment in detail. Provide all electrical equipment and wiring as required.
D. As soon as permanent power and metering is available, the temporary power supply shall be
disconnected and removed from the project site.
E. All temporary wiring shall meet the requirements of NEC Article 305 and the State Industrial
Commission.
3.6 POWER OUTAGES:
A. All power outages required for execution of this work shall occur during non-standard working
hours and at the convenience of the owner. Any electrical service interruption will be
coordinated at least 7 days in advance of the power shut-off. Include all costs for overtime work
in bid. Coordinate all outages and proceed only after receiving authorization from the owner's
representative. Keep all outages to an absolute minimum.
3.7 STORAGE AND PROTECTION OF MATERIALS:
A. Provide storage space for storage of materials and apparatus and assume complete
responsibility for all losses due to any cause whatsoever. Lost or damaged materials will be
replaced at no additional cost to owner. Do not store materials and apparatus in any public
thoroughfare or in any area on the site where such storage would constitute a hazard to
persons in the vicinity. Protect completed work, work underway, and apparatus against loss or
damage.
Bid DA14027DFCM
5/30/2014 2:08 PM p. 62