Specifications
Draper Prison Wasatch & Oquirrh Intercom & Paging System Remodel 4-21-2014
ELECTRICAL GENERAL PROVISIONS 260001 – 5
2.3 SPARE PARTS:
A. Provide spare parts as specified in Divisions 26, 27, and 28 sections. Deliver all spare parts to
owner's representative prior to substantial completion.
PART 3 – EXECUTION
3.1 GENERAL:
A. Workmanship: Provide only first class workmanship from competent workers. Defective
materials or workmanship will not be allowed on the project. Provide competent supervision for
the work to be accomplished. Keep same foreman on the job, unless a change is authorized
by the engineer.
B. Coordination: Prior to construction, layout electrical work and coordinate work with other
trades. Sequence, coordinate, and integrate installation of materials and equipment for efficient
flow of the work. Coordinate the installation of required supporting devices and sleeves to be
set in poured-in-place concrete and other structural components, as they are constructed.
Install electrical equipment to facilitate maintenance and repair or replacement of equipment
components. Coordinate the installation of electrical materials and equipment above ceilings
with suspension system, mechanical equipment and systems, and structural components.
Coordinate with all utilities including power, communication, and data installations.
C. Provide cutting, drilling, channeling, etc. only as necessary for proper completion of the work.
Do not cut structural members unless authorization is issued in writing by the architect/engineer.
D. Repairs: Repair damage to building, grounds, or utilities as a result of work under this contract
at no additional cost to the owner.
E. Dimensioning: Electrical drawings indicate locations for electrical equipment only in their
approximate location, unless specifically dimensioned. Do not scale electrical drawings for
dimensional information. Refer to architectural drawings and shop drawings where applicable
for locations of all electrical equipment. Field verify all dimension on the job site.
F. Provide block-outs, sleeves, demolition work, etc., required for installation of work specified in
this division.
G. Standards: Provide electrical installation in accordance with manufacturer's written
instructions, applicable requirements of NEC, NEMA standards, and NECA's "Standards of
Installation", and in compliance with recognized industry practices to ensure that products fulfill
requirements.
H. All workmen doing work of any nature on State of Utah projects must at all times carry their
electrician's license with them and show it upon request. The acceptable ratio of apprentice to
journeyman electricians on the job is 1:1.
3.2 REQUESTS FOR INFORMATION:
A. When it is clearly apparent that information is not adequately described in the construction
documents or when a coordination problem exists, submit a request for information (RFI)
through proper contractual channels. The electrical engineering design firm will provide a
response through its contractual channel. Although verbal direction may be given to expedite
changes, responses are not considered part of the contract documents until a change order has
Bid DA14027DFCM
5/30/2014 2:08 PM p. 61