Specifications

18. Any person who the officer believes is arriving at the prison impaired by alcohol or
drugs shall be denied access to prison property and may also be detained pending
arrival of an Enforcement Officer who will determine if a citation or arrest is warranted.
19. When working inside the prison fence lines, all traffic is checked, searched, and cleared
at our main truck gate sally ports. In order to help us expedite your traffic, all trips
through the gates should be limited to those which are absolutely necessary. 'Car
pooling' in company vehicles from the main prison parking areas into the construction
site is required. When checking in through the prison gates, all workers in any and all
vehicles must get out of the vehicle and stand next to it while it is searched and their
identity is verified.
20. Private vehicles used primarily for transportation will not be allowed into construction
sites. "Company" and/or primary "work" vehicles will be permitted.
21. Foot traffic into construction sites is encouraged when practical.
22. Driver's licenses or other picture I.D. of all workers will be taken at the gates to the
construction sites for I.D. and control purposes. A temporary pass from that gate will
be issued to be worn in plain sight while working on site. Upon departure from the
work site, this temporary pass will be returned to the gate that issued the pass and
personal Driver License or other Id will be returned upon exit.
23. In the event of a prison emergency, i.e., fire, escape, riot, etc., all construction sites
will be secured and traffic to and from the sites halted. Work within the sites will be
allowed to continue normally as long as there is no physical threat to the site(s).
When the emergency has been verified and resolved, the site will be re-opened to
traffic. If evacuation of a site Is necessary, everyone will be expected to gather in one
central location identified by the security officer, and then will be escorted off property
Bid DA14027DFCM
5/30/2014 2:08 PM p. 29