Specifications
Draper Prison Wasatch & Oquirrh Intercom & Paging System Remodel 4-21-2014
PUBLIC ADDRESS SYSTEMS 275116 - 2
B. Zone: Separate group of loudspeakers and associated supply wiring that may be arranged for
selective switching between different channels.
1.4 ACTION SUBMITTALS
A. Product Data: For each type of product.
B. Shop Drawings: Power, signal, and control wiring.
1. Include plans, elevations, sections, and attachment details.
2. Include details of equipment assemblies. Indicate dimensions, weights, required
clearances, method of field assembly, components, and location and size of each field
connection.
3. Console layouts.
4. Control panels.
5. Rack arrangements.
6. Wiring Diagrams: For power, signal, and control wiring.
a. Identify terminals to facilitate installation, operation, and maintenance.
b. Single-line diagram showing interconnection of components.
c. Cabling diagram showing cable routing.
C. Delegated-Design Submittal: For supports and seismic restraints for control consoles,
equipment cabinets and racks, and components indicated to comply with performance
requirements and design criteria, including analysis data signed and sealed by the qualified
professional engineer responsible for their preparation.
1. Detail fabrication and assembly of supports and seismic restraints for control consoles,
equipment cabinets and racks, and components.
1.5 INFORMATIONAL SUBMITTALS
A. Seismic Qualification Certificates: For control consoles, equipment cabinets and racks,
accessories, and components, from manufacturer.
1. Basis for Certification: Indicate whether withstand certification is based on actual test of
assembled components or on calculation. Include qualification data for testing agency.
2. Dimensioned Outline Drawings of Equipment Unit: Identify center of gravity and locate
and describe mounting and anchorage provisions.
3. Detailed description of equipment anchorage devices on which the certification is based
and their installation requirements.
B. Field quality-control reports.
1.6 CLOSEOUT SUBMITTALS
A. Operation and Maintenance Data: For public address systems to include in emergency,
operation, and maintenance manuals.
a. Operating instructions laminated and mounted adjacent to operating console
location.
Bid DA14027DFCM
5/30/2014 2:08 PM p. 100










