Technical data
CORRECTIVE MAINTENANCE
CV ELECTRICAL POWER SYSTEM MAINTENANCE MANUAL 2A5A2-ELEC-MM-1-0 30
Procedure
1. Follow instructions in Section 6.2, General Notes, regarding hazmat
requirements, torque specifications, inspection of mounting hardware, and use of
Nylok® nuts, as applicable.
2. Perform the following steps in accordance with local requirements for SOC and
tag in/out, as applicable.
3. Turn off the light.
4. For the forward external light, disconnect cable
2A5A2-CBL-EP31, connector J4 at
the signal demarcation panel. For the aft external light, disconnect cable
2A5A2-
CBL-EP32
, connector J7 at the signal demarcation panel.
5. Remove the light assembly and cable from the CV frame.
6. Install the new light assembly.
7. Reroute the cable. For the forward external light, connect cable
2A5A2-CBL-EP31,
connector
J4 at the signal demarcation panel. For the aft external light, connect
cable 2A5A2-CBL-EP32, connector J7 at the signal demarcation panel.
8. Turn on the light and confirm functionality.
9. Return valves and electrical switches to the state that they were in before this
procedure was performed.
10. Inspect and determine disposition of any parts removed. If applicable, dispose of
removed parts and/or fluids in accordance with local requirements.
11. Ensure the preceding steps were performed in accordance with local
requirements for SOC and tag in/out, as applicable.
0.