Technical data
CORRECTIVE MAINTENANCE
CV ELECTRICAL POWER SYSTEM MAINTENANCE MANUAL 2A5A2-ELEC-MM-1-0 12
Special Tools
None
Spare Parts
7533422 Exterior utility power cable assembly
7533460 GFM power cable assembly
SPC11683 Power cable – SPC Technology
Preconditions
None
Procedure
1. Follow instructions in Section 6.2, General Notes, regarding hazmat
requirements, torque specifications, inspection of mounting hardware, and use of
Nylok® nuts, as applicable.
2. Perform the following steps in accordance with local requirements for SOC and
tag in/out, as applicable.
3. If power is connected to the unit, isolate power. For the power tray and the
ground fault monitor cable, turn off the device and disconnect the power cable
from the power bar. For the exterior utility, at the 208/120 VAC 3∅ distribution
panel,
BUS #1, turn off breaker CB 7, EXTERIOR UTILITY OUTLET.
4. Disconnect cable at both ends.
CAUTION!
Use only industrial grade, 99% pure isopropyl alcohol.
5. For exterior cables, clean receptacle and new cable with isopropyl alcohol.
6. Connect new cable.
7. For the power tray and the ground fault monitor cable, reconnect the power cable
to the power bar and turn on the device. For the exterior utility, at the 208/120
VAC 3 ∅ distribution panel,
BUS #1, turn on breaker CB 7, EXTERIOR UTILITY
OUTLET
.
8. Confirm functionality of the device.
9. Return valves and electrical switches to the state that they were in before this
procedure was performed.
10. Inspect and determine disposition of any parts removed. If applicable, dispose of
removed parts and/or fluids in accordance with local requirements.
11. Ensure the preceding steps were performed in accordance with local
requirements for SOC and tag in/out, as applicable.
0.