Technical data

CV ELECTRICAL POWER SYSTEM MAINTENANCE MANUAL 2A5A2-ELEC-MM-1-0 11
4 Corrective Maintenance
4.1 Corrective Maintenance Index
Table 4 provides an index to procedures for correcting malfunctions of the CV
Electrical Power System. See Chapter 5, Troubleshooting, for assistance in selecting
an appropriate procedure.
Table 4 Corrective Maintenance Index
Section # Procedure
4.2 Replacing a Cable
4.3 Replacing the Ground Fault Monitor
4.4 Measuring High Voltage
4.5 Replacing an HPU Boost Transformer
4.6 Replacing a Hotel Boost Transformer
4.7 Replacing a Service Transformer
4.8 Replacing a Control Power UPS
4.9 Replacing the Hotel Power UPS
4.10 Replacing a Power Bar
4.11 Replacing a Power Tray Power Supply
4.12 Replacing a Power Tray Fuse
4.13 Replacing a Power Room Fluorescent Assembly
4.14 Replacing a Control Room Fluorescent Assembly
4.16 Replacing an Exterior Light Assembly
4.17 Replacing a Rotating Light
4.2 Replacing a Cable
WARNING!
Shock hazard! Verify power to the unit is isolated before performing this
corrective maintenance procedure.
Drawing References
7533009 Power system assembly (2A5A2)
7533010 Power system cable routing
7533011 CV electrical power system schematic (2A5A2)