Specifications

Unistar Sx Series UPS
Form No. 003-2077
20
Battery Replacement Procedure for Rack Mount ModelsBattery Replacement Procedure for Rack Mount Models
Battery Replacement Procedure for Rack Mount ModelsBattery Replacement Procedure for Rack Mount Models
Battery Replacement Procedure for Rack Mount Models
(Must be performed by Authorized Service Personnel ONLY)
PLEASE READ THE CAUTIONS BEFORE PLEASE READ THE CAUTIONS BEFORE
PLEASE READ THE CAUTIONS BEFORE PLEASE READ THE CAUTIONS BEFORE
PLEASE READ THE CAUTIONS BEFORE
AA
AA
A
TTEMPTING TTTEMPTING T
TTEMPTING TTTEMPTING T
TTEMPTING T
O REPLACE THE BAO REPLACE THE BA
O REPLACE THE BAO REPLACE THE BA
O REPLACE THE BA
TTERIESTTERIES
TTERIESTTERIES
TTERIES
These units are hot-swappable. Hot-swappable batteries means that the batteries can be
replaced without powering down the whole UPS system. NOTE: If there is a power interruption
while replacing the hot-swappable batteries, with the UPS on, the load will not be backed up.
1. Utilize steps 1-5 from page 18 if you do not want to hot-swap. Then proceed.
2. Remove the three retaining screws from front panel of the UPS.
3. Remove the six retaining screws and the battery case retaining bracket.
4. Disconnect the battery wiring harness connector.
5. Remove the battery case.
6. Insert the new battery case.
7. Connect the battery harness connector.
8. Reinstall the battery case retaining bracket and the retaining screws.
9. Reinstall the front panel and the retaining screws.
10. Dispose of the batteries properly at an appropriate recycling facility or return them to the
supplier in the packing material for the new batteries. Follow local EPA guidelines when
disposing of batteries. Note: These batteries contain lead and must be disposed of per
environmental guidelines.
11. The UPS is now ready for the normal start-up procedure if required.