Service manual

D-77
(5) Adjustment of Turnover Route Switching Solenoid
Requirement
The gap between the E-ring of the plunger and the Switching Solenoid should be 3 ± 0.2
mm when the Switching Solenoid OFF.
Adjustment Procedure
3. Move the Switching Solenoid so that the gap between the E-ring of the plunger and the
Solenoid is 3 ± 0.2 mm when the Switching Solenoid OFF.
4. After adjustment is completed, tighten the two Switching Solenoid mounting screws.
1. Remove the Left Cover.
2. Loosen two screws by which the Switching Sole-
noid is mounted.
4002D214AC
4002D014AA
3±0.2mm