User guide
Configuring the Network
Performing Additional Configuration Operations
44 | Smart 216/232 IP
2. In Name, select the PDU for which you want to configure the power outlets.
The number of outlets and Server Name dropdown menus corresponds to the
type of the selected PDU.
Figure 32 – Assigning Servers to Power Outlets Page
3. For each Outlet, select the Server Name from the dropdown list of the server
connected to it.
3.13 Performing Additional Configuration Operations
You can perform the following additional operations on Smart 216/232 IP:
Install an SSL certificate.
Upgrade firmware.
Upgrade RICCs/ROCs.
Restore factory settings.
Back up and restore data.
3.13.1 Installing an SSL Certificate
You can install an SSL Certificate, to ensure secure transactions between the Web
servers and browsers.