Instruction manual

7
ASSEMBLY SEQUENCE SUMMARY
Section: Subassembly:
I Building the Rotor head
II Building the Left Main Frame
III Installing the Main Shaft, Main Gear and Front Tail Drive
IV Building and Installing the Radio Support Assembly
V Installing the Right Main Frame, Bell cranks and Gyro Brackets
VI Building and Installing the Landing Gear
VII Installing the Clutch, Fan, and Engine Assembly (Including Guidelines for Engine and Exhaust Selection).
VIII Building and Installing the Fuel Tank Assembly
IX Installing the Swash plate, Washout Unit and Rotor head Assembly
X Building the Tail Rotor Assembly
XI Building the Tail boom Assembly, Boom Supports and Installation onto the Main Mechanics
XII Installing the Radio System and Pushrods
XIII Preparing the Canopy
XIV Rotor Blade Selection
XV Final Mechanical and Electronic Set-up
XVI Final Inspection
XVII Pre-Flight Information
XVIII Starting and Stopping Procedures
XIX First Flight Adjustments