Installation Guide
Table Of Contents
Wi-Fi WASP Infrastructure Installation Guide
Installation Guide
Section 4 Installing Infrastructure
Rev: 1 10 / 28
© Minetec 2019
Figure 2 AP Mesh mount Figure 3 AP Threaded rod mount
4.1.1 Before you start
Before commencing work, plan and prepare for the installation ensuring that you read, understand
and perform the appropriate planning and preparation steps including, but not limited to:
• Guidelines on page 4
.
• Planning on page 7.
• All electrical work to be done by qualified, authorised and deemed competent persons.
• The work area is clear and free from hazards.
• All relevant onsite permissions and permits to work have been obtained.
• All safety precautions are in line with Mine Operator policy.
• All required hardware and cabling is available.
4.1.2 AP installation
Before performing the steps in this guide, ensure all site operational, EHS and/or
maintenance practices are followed including, but not limited to the 'permit to work'
system, isolation of stored energy and use of the appropriate PPE.
If site-specific Work Instructions exist for any of the tasks described in this section, use those Work
Instructions instead of these guidelines.