Planning approval and permit to work documents per operational and HSE.
All required hardware and cabling is available.
Positive electrical isolation using site 'lock out tag out' system (eg padlock isolators).
Appropriate PPE.
Before commencing any electrical work, ensure that:
You have read and understood the Safety on page ii.
All electrical work to be done by qualified, authorised and deemed competent persons.
The work area is clear and free from hazards.
All relevant onsite permissions and permits to work have been obtained.
Power is isolated, as per site operational and HSE procedures.
All safety precautions are in line with Mine Operator policy for working on electrical items.
All required hardware and cabling is available.
If operating in sub-zero temperatures, also see Cold weather operation on page 61.