Installation Guide
E.) Installing the Unit
Installing the Electrode Chamber
Turn off the pump and all valves. Disconnect all
power going to the motor, timer box or power
source.
1.) Wrap Teon tape around the two threaded male
adapters. You can also use “Liquid Teon” a thread
sealant with Teon. Always use plenty of tape to
avoid possible leaks. Screw adapters into the black
ow cell chamber.
2.) If the pipe size where the ow-cell
chamber is being installed is 1 ½”, glue the
two reducer bushings (2” x 1 ½”) into the
male adapters. This step is not necessary if
installing on two-inch pipe.
3.) Locate a space to mount the black ow-cell chamber. Always install on
the return line. If possible, install the chamber after the lter, but it is not
required if there is not enough space. If necessary, you can re-pipe an entire section to allow proper room for the electrode
chamber or ScaleBlaster coil.
4.) Using a hacksaw or pipe cutter, cut out a 6”section of pipe if 2” pipe exists, or 6 ½” of pipe if 1 ½” pipe exists.
5.) In the area where the pipe was cut out, mount the black ow-cell chamber horizontally to avoid possible air pockets.
In other words, make sure the black ow cell is angled downward, so that when the electrodes are screwed into the cham-
ber, the wire connections are facing the ground and not the sky. The tee can also be installed on any vertical pipe. Do not
force pipes as they may snap. Always use PVC cleaner on the inside of the tee and the outside of the pipe before slapping
on the glue. Do not perform this step until you are absolutely ready to install the tee, as the cement will cure very quickly.