Installation Guide
Page 6
C.) Tools and Materials Required
TheRC-50MineralPURE/ScaleBlasterunitshouldbeinstalledatthepool’spumpandlterarea.You
will need to locate a place to mount the RC-50 control box on a wall and within 10 feet or so of where you
will install the electrode chamber and ScaleBlaster signal coil on the return line of your pool equipment.
This location will also need to be within 6 feet of an electrical source.
D.) Site Survey
• Bullet Level • Channel Lock Wrench
• Conduit Connector, ½” Straight • Conduit, Flexible/Electric hookup cable
• Crescent Wrench • Drill & Drill Bits
• Hacksaw or Pipe Cutter • Hammer
• PVC Cement • PVC Cleaner/Primer
• Screwdrivers, Flat & Phillips • Screws & Anchors
• Teon Tape or Liquid Teon • Utility Knife
• Voltage Meter • Wire Stripper
• Other tools may be required
Control Box
Location
Power
Source
Within
6 feet
Electrode
chamber
within 10 feet
ScaleBlaster
signal cable
within
10 feet