Full Product Manual
Page 6
C.) Tools and Materials Required
D.) Site Survey
• Bullet Level • Channel Lock Wrench
• Conduit Connector, ½" Straight • Conduit, Flexible/Electric hookup cable
• Crescent Wrench • Drill & Drill Bits
• Hacksaw or Pipe Cutter • Hammer
• PVC Cement • PVC Cleaner/Primer
• Screwdrivers, Flat & Phillips • Screws & Anchors
• Teflon Tape or Liquid Teflon • Utility Knife
• Voltage Meter • Wire Stripper
• Other tools may be required
The RC-50 MineralPURE/ScaleBlaster unit should be installed at the pool's pump and filter area. You
will need to locate a place to mount the RC-50 control box on a wall and within 10 feet or so of where you
will install the electrode chamber and ScaleBlaster signal coil on the return line of your pool equipment.
This location will also need to be within 6 feet of an electrical source.
Control
Box
Location
Power Source Power Source
within 6 feetwithin 6 feet
Power Source
within 6 feet
ElectrodeElectrode
ChamberChamber
within 10 feetwithin 10 feet
Electrode
Chamber
within 10 feet
ScaleBlasterScaleBlaster
Signal CableSignal Cable
within 10 feetwithin 10 feet
ScaleBlaster
Signal Cable
within 10 feet