Operator's Manual

Maintenance and Testing Schedule Maintenance
17 - 4 TM80/TM70 Telemetry Monitor Operator’s Manual
17.4 Maintenance and Testing Schedule
The following maintenance and tests, except for visual inspection, power on test, and
battery check, shall be carried out by the service personnel only. Contact your service
personnel if any maintenance is required. Make sure to clean and disinfect the equip-
ment before any test and maintenance.
17.5 Checking the System Information
To view the information about the device, radio frequency (RF), battery, MPAN, and sys-
tem statistics, Press the key to enter the main menu and then select [System Info].
Check/Maintenance Item Recommended Frequency
Visual inspection When first installed or reinstalled.
ECG test and verification Performance test 1. If the user suspects that the measurement is
incorrect.
2. Following any repairs or replacement of rele-
vant module.
3. Once every two years.
Note: NIBP test should be performed at least twice
a year.
Verification
SpO
2
test
Resp test Performance test
NIBP test Pressure check
Leakage test
Nurse call test If the user suspects that the nurse call functionality
does not work properly.
Power on test 1. When first installed or reinstalled.
2. Following any maintenance or the replace-
ment of any main unit parts.
Battery check Functionality test 1. When first installed.
2. Whenever the battery is replaced.
Performance test When the battery run time reduced significantly.