Installation Guide

Equipment Required Antenna System Calibration
4 - 2 0070-00-0571 Panorama WMTS Installation Guide
4.1 Equipment Required
1. Program the test transceiver to a frequency within a quadrant that is to be used in the
installation.
2. Connect the coax cables from the antenna system to the appropriate ports on the TIM
Transceiver (main to A and diversity to B).
3. Turn on the TIM Transceiver.
4. Re-boot Server 1 (first Server on the system) into NT screen.
5. Log on to the Server.
6. Double click on the WMTS.exe ICON. The WMTS API Test Utility will open (shown in
FIGURE 4-1).
FIGURE 4-1
Test Transceiver P/N 0454-00-0037-XX
RF Attenuators P/N 0454-00-0038-XX
SMA to BNC Adapter Cable P/N 0454-00-0041
SMA-to-SMA Adapter Cable P/N 0454-00-0050