User's Manual

Panorama™ Operating Instructions 0070-00-0575-50 10 - 9
Telepack (Optional) Operating Instructions
10.4 Operating Instructions
This section of the manual provides instructions for programming the Telepack device for use
with the Panorama Central Station.
10.4.1 Initial Setup of Telepack
The Panorama Central Station should be installed and running before you begin to set up the
Telepack device. For additional information, refer to the Panorama Service Manual
(P/N 0070-00-0457).
The following items are required to initially install and program the Telepack:
• Telepack device
• 2 AA size alkaline or lithium (for Telepack-608 only) batteries
• Telepack Service Mode Cable
10.4.1.1 Inserting batteries
To activate the Telepack device, insert the 2 AA size alkaline or lithium (for Telepack-608
only) batteries in the Telepack battery compartment. For the Telepack-2.4, the positive (+) end
of each battery should be facing downward. For the Telepack-608, the positive (+) end of
each battery should be facing upward. (Use the label on the back of the Telepack as a
guide.) Secure the end cap of the battery compartment by twisting firmly in the clockwise
direction.
The Telepack automatically performs an initial system check if the batteries are installed
properly.
FIGURE 10-5 Rear panel
Telepack-2.4
FIGURE 10-6 Rear panel
Telepack-608
¨
Datascope Corp., Mahwah, NJ 07430
T
HIS DEVICE COMPLIES WITH PART 15 OF THE
FCC RULES. SEE INSTRUCTION MANUAL.
FCC ID: DXXWT0191-00000
P/N
S/N
ID
IPX 7
AA
AA